After 8 months of work at the Edouard Herriot port, the THÉÂTRE L'ÎLE Ô was transported to its final location last week.
Towed by the pusher Pierre et Paul, under the watchful eye of the CFI SNSM de Lyon SNSM of Lyon in pilot boat and its architect Waterstudio.NL, the PORALU MARINE team was waiting for its arrival to connect the anchoring system.
VICASTEL PROJECT MANAGEMENT ensured the technical feasibility of the transport and the anchoring system by coordinating the enginering teams.
Congratulations to the project leaders David Lahille and Jean-Philippe Amy, who showed unfailing determination to make this cultural project a success and to fight, with the children, against cultural malnutrition.
Comments